{"id":9300,"date":"2026-07-28T09:00:17","date_gmt":"2026-07-28T02:00:17","guid":{"rendered":"https:\/\/www.agungrejeki.site\/?p=9300"},"modified":"2026-07-23T15:43:06","modified_gmt":"2026-07-23T08:43:06","slug":"rfq-checklist-for-construction-equipment","status":"publish","type":"post","link":"https:\/\/www.agungrejeki.site\/en\/checklist-rfq-alat-konstruksi\/","title":{"rendered":"Construction Equipment RFQ Checklist: Information to Prepare for a More Accurate Bid"},"content":{"rendered":"<p><a href=\"\/checklist-rfq-alat-konstruksi\/\">Construction Equipment RFQ Checklist: Information to Prepare for a More Accurate Bid<\/a> \u2013 When requesting a quote for construction equipment, it\u2019s not enough to simply write, \u201cPlease provide a price quote for the machinery needed for the project.\u201d Such a request does not specify the equipment\u2019s function, required capacity, number of units, operating conditions, project location, schedule, accessories, or the scope of costs to be included in the quote.<\/p>\n<p class=\"isSelectedEnd\">As a result, suppliers are forced to provide repeated clarifications. Other risks include products being compared that are not equivalent, essential accessories not being included in the proposal, logistics costs not being factored in, or rental and purchase requirements being mixed together in a single request.<\/p>\n<p class=\"isSelectedEnd\">By using <strong>RFQ Checklist for Construction Equipment<\/strong>, procurement, purchasing, and contractor teams, as well as project teams, can communicate their needs in a more structured manner. Comprehensive information helps the sales team review equipment options, identify missing data, and prepare more relevant proposals without making any commitments regarding price, inventory, lead time, warranty, or availability until everything has been confirmed.<\/p>\n<h2>What Is a Construction Equipment RFQ?<\/h2>\n<p class=\"isSelectedEnd\">RFQ stands for <em>Request for Quotation<\/em> or a request for quotation. In the procurement process, an RFQ is used to ask suppliers to submit quotations based on the requirements, specifications, quantities, and commercial terms that have been outlined.<\/p>\n<p class=\"isSelectedEnd\">The UN Global Marketplace defines an RFQ as a request to potential suppliers to submit quotations for procurement needs. The World Bank also provides RFQ documents for the procurement of goods as part of its official procurement framework.<\/p>\n<p class=\"isSelectedEnd\">For construction equipment needs, an RFQ can be used when a company needs:<\/p>\n<ul data-spread=\"false\">\n<li>purchase of new equipment;<\/li>\n<li>purchase of used equipment;<\/li>\n<li>equipment rental;<\/li>\n<li>tool kit and accessories;<\/li>\n<li>equipment requirements for <a href=\"\/layanan\/dukungan-tender-proyek\/\">tender<\/a>;<\/li>\n<li>product alternatives based on function and specifications;<\/li>\n<li><a href=\"\/layanan\/konsultasi-kebutuhan-alat-konstruksi\/\">consultation<\/a> initially, when the model of the device is unknown.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">An RFQ is not a contract and does not guarantee that a specific product is available. An RFQ serves as the basis for conducting technical and commercial evaluations before a bid is issued.<\/p>\n<h2>Why Do Comprehensive RFQs Lead to More Accurate Quotes?<\/h2>\n<p class=\"isSelectedEnd\">The objective of procurement is not merely to secure the best price, but to obtain goods or services that meet the required standards in terms of quality, quantity, timing, cost, location, and supplier. These aspects are also included in the procurement objectives outlined in Indonesia\u2019s government procurement regulatory framework.<\/p>\n<p class=\"isSelectedEnd\">In practice, a comprehensive RFQ helps:<\/p>\n<ol start=\"1\" data-spread=\"false\">\n<li>distinguish between mandatory specifications and those that are merely desirable;<\/li>\n<li>reduce the risk of selecting the wrong category or model;<\/li>\n<li>compare products on an equal basis;<\/li>\n<li>determine whether the need involves a purchase, a rental, or requires further consultation;<\/li>\n<li>clarify accessories and additional equipment;<\/li>\n<li>identify mobilization, operator, and loading and unloading needs;<\/li>\n<li>reduce the need to revise quotations due to incomplete data;<\/li>\n<li>simplifies the review of bid documents or datasheets;<\/li>\n<li>determine which information still needs to be confirmed by the supplier.<\/li>\n<\/ol>\n<p class=\"isSelectedEnd\">The right offer does not mean that suppliers simply select products based on the generic name of the equipment. The selection process still requires a comparison between the requirements and the product data sourced from primary documents.<\/p>\n<h2>Construction Equipment RFQ Data Checklist<\/h2>\n<table>\n<tbody>\n<tr>\n<th>RFQ Information<\/th>\n<th>Why is it necessary?<\/th>\n<th>Sample information<\/th>\n<th>Status<\/th>\n<\/tr>\n<tr>\n<td>Identity of the applicant or company<\/td>\n<td>Determining the party responsible for submitting requests and managing communications<\/td>\n<td>Company name and procurement division<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Project name or type of work<\/td>\n<td>Providing context for the tool's application<\/td>\n<td>Concrete pouring, compaction, cutting, or installation work<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Location of use or delivery<\/td>\n<td>Required for logistics and field condition inspections<\/td>\n<td>City\/county and type of location access<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Tool categories<\/td>\n<td>Narrow your search to the right product category<\/td>\n<td>Pumps, compressors, compactors, cutters, or generators<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Function of the device<\/td>\n<td>Explaining the work that needs to be done<\/td>\n<td>Pumping water, generating compressed air, or compacting soil<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Brand or model<\/td>\n<td>Ensuring compliance when a brand or model is required<\/td>\n<td>Brand\/model as specified in the tender documents, if any<\/td>\n<td>To be confirmed<\/td>\n<\/tr>\n<tr>\n<td>Mandatory technical specifications<\/td>\n<td>Serves as the primary basis for conformity assessment<\/td>\n<td>Capacity, size, power source, or other technical parameters specified in official documents<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Preference Specifications<\/td>\n<td>Helps narrow down the options without making it an absolute requirement<\/td>\n<td>Design preferences, control types, or configurations<\/td>\n<td>Highly recommended<\/td>\n<\/tr>\n<tr>\n<td>Number of units<\/td>\n<td>Determining the required volume<\/td>\n<td>One unit, several units, or a package<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Requirements<\/td>\n<td>Specify whether you're looking for a new, used, or rental vehicle, or if you're open to other options<\/td>\n<td>New, used, rental, or undetermined<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Rental duration<\/td>\n<td>Serves as the basis for the scope of the lease offer<\/td>\n<td>Daily, weekly, monthly, or based on the project period<\/td>\n<td>Required for rentals<\/td>\n<\/tr>\n<tr>\n<td>Accessories and equipment<\/td>\n<td>Preventing support components from being overlooked<\/td>\n<td>Attachments, hoses, cables, connectors, or additional equipment<\/td>\n<td>Highly recommended<\/td>\n<\/tr>\n<tr>\n<td>Power sources and site conditions<\/td>\n<td>Checking compatibility<\/td>\n<td>Electricity is available; requirements for a drive motor, wet areas, or restricted access<\/td>\n<td>Highly recommended<\/td>\n<\/tr>\n<tr>\n<td>Procurement or usage targets<\/td>\n<td>Serves as the basis for confirming schedules and lead times<\/td>\n<td>Required date or implementation period<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Need for additional services<\/td>\n<td>Separating equipment from operating costs and services<\/td>\n<td>Operator, mobilization, demobilization, helper, or loading and unloading<\/td>\n<td>To be confirmed<\/td>\n<\/tr>\n<tr>\n<td>Supporting documents<\/td>\n<td>Strengthening identification and matching<\/td>\n<td>Photos, nameplates, datasheets, working drawings, or bid specifications<\/td>\n<td>Highly recommended<\/td>\n<\/tr>\n<tr>\n<td>Taxes and Administration<\/td>\n<td>Determining the format and basis of the quotation<\/td>\n<td>VAT included\/excluded, invoice requirements, company documents, or tender format<\/td>\n<td>To be confirmed<\/td>\n<\/tr>\n<tr>\n<td>PIC Clarification<\/td>\n<td>Speeding up the resolution of technical and commercial inquiries<\/td>\n<td>Name, title, and contact information of the person in charge<\/td>\n<td>Required<\/td>\n<\/tr>\n<tr>\n<td>Shipping origin<\/td>\n<td>It is necessary to estimate the logistics plan<\/td>\n<td>Warehouse or shipping source to be confirmed<\/td>\n<td>To be confirmed<\/td>\n<\/tr>\n<tr>\n<td>Cost limit<\/td>\n<td>Helps narrow down the options if they can be shared<\/td>\n<td>Internal budget range or evaluation threshold<\/td>\n<td>Optional<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Break Down Each Requirement Parameter<\/h2>\n<p class=\"isSelectedEnd\">A common mistake in the format of a tool request for proposal is mixing several parameters into a single sentence. For example:<\/p>\n<blockquote>\n<p class=\"isSelectedEnd\">\u201cWe need a compressor from a specific brand that\u2019s powerful, affordable, comes with all the necessary accessories, and can be shipped immediately.\u201d<\/p>\n<\/blockquote>\n<p class=\"isSelectedEnd\">That sentence mixes categories, brands, preferences, budget limits, package inclusions, and schedules. Each element must be separated so it can be reviewed independently.<\/p>\n<p class=\"isSelectedEnd\">Use the following structure:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Tool category:<\/strong> product category you're looking for.<\/li>\n<li><strong>Function:<\/strong> the work the machine must perform.<\/li>\n<li><strong>Brand:<\/strong> manufacturers that are required or prioritized.<\/li>\n<li><strong>Model:<\/strong> the identity of a specific model, if known.<\/li>\n<li><strong>Required specifications:<\/strong> parameters that must not differ.<\/li>\n<li><strong>Preference specifications:<\/strong> parameters that may be considered but are not mandatory.<\/li>\n<li><strong>Total:<\/strong> total number of units or packages required.<\/li>\n<li><strong>Application:<\/strong> working conditions and the materials being handled.<\/li>\n<li><strong>Condition:<\/strong> New, used, rental, or to be determined.<\/li>\n<li><strong>Origin:<\/strong> The origin or starting point of the shipment that needs to be confirmed.<\/li>\n<li><strong>Cost limit:<\/strong> budget range, if available.<\/li>\n<li><strong>Logistics:<\/strong> shipping, packing, insurance, loading and unloading, and project access.<\/li>\n<li><strong>Additional services:<\/strong> operations, installation, mobilization, demobilization, or documentation support.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">With this separation, the sales team can flag which data is complete and which still needs to be clarified.<\/p>\n<h2>Brand, Model, SKU, Part Number, and Serial Number Do Not Match<\/h2>\n<p class=\"isSelectedEnd\">A brand is the name of a manufacturer or brand. A model identifies a product family or type. An SKU is generally an inventory management code used by a company. A part number identifies a specific component or part, while a serial number is used to distinguish one physical unit from another.<\/p>\n<p class=\"isSelectedEnd\">GS1 distinguishes between basic product identity, component or part identity, and serialization at the individual unit level. The combination of product identity and serial number can be used to uniquely identify a single physical instance.<\/p>\n<p class=\"isSelectedEnd\">Therefore, a photo of the nameplate can be helpful when a customer needs a replacement unit, spare parts, accessories, or machine identification. However, the information on the nameplate must still be read according to the manufacturer\u2019s format and should not be assumed to be a part number without verification.<\/p>\n<h2>How Is the Product Matching Process Conducted?<\/h2>\n<p class=\"isSelectedEnd\">Once the requirements are received, the data is compared with the datasheet, catalog, nameplate, or official product documentation. The inspection results may have the following statuses:<\/p>\n<ul data-spread=\"false\">\n<li><strong>Full Match:<\/strong> All parameters must match.<\/li>\n<li><strong>Partial Match:<\/strong> Some of the required parameters are correct, but there are still some missing ones.<\/li>\n<li><strong>Close Match:<\/strong> The product comes close to meeting the needs, but there are differences that must be evaluated.<\/li>\n<li><strong>Equivalent Match:<\/strong> Different products that can be evaluated as equivalent based on agreed-upon parameters.<\/li>\n<li><strong>No Match:<\/strong> One or more mandatory requirements have not been met.<\/li>\n<li><strong>Insufficient Data:<\/strong> The requirements or product data are incomplete.<\/li>\n<li><strong>Not Found:<\/strong> No products have been verified based on the available sources.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">That status should not be granted simply because the product names appear similar. The requirements and product data must be available first.<\/p>\n<h2>Example of an Incomplete RFQ<\/h2>\n<blockquote>\n<p class=\"isSelectedEnd\">To the sales team,<\/p>\n<p class=\"isSelectedEnd\">Please send us the prices for the compaction equipment for our project. We need them as soon as possible, and please make sure the quote is complete.<\/p>\n<p class=\"isSelectedEnd\">Thank you.<\/p>\n<\/blockquote>\n<p class=\"isSelectedEnd\">The RFQ does not yet specify:<\/p>\n<ul data-spread=\"false\">\n<li>types of compaction work;<\/li>\n<li>area and surface conditions;<\/li>\n<li>required capacity or size;<\/li>\n<li>number of units;<\/li>\n<li>purchase or rental;<\/li>\n<li>location;<\/li>\n<li>target date;<\/li>\n<li>accessories;<\/li>\n<li>operator;<\/li>\n<li>logistics;<\/li>\n<li>tax;<\/li>\n<li>Clarification from the PIC.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">The sales team does not yet have sufficient information to determine the product or the scope of the proposal.<\/p>\n<h2>An Example of a Better RFQ<\/h2>\n<blockquote>\n<p class=\"isSelectedEnd\"><strong>Applicant:<\/strong> PT Example Construction \u2014 Procurement Division<br \/>\n<strong>Job:<\/strong> Compaction of the construction project work area<br \/>\n<strong>Location of use:<\/strong> Example City: Vehicle access needs to be confirmed<br \/>\n<strong>Tool category:<\/strong> Compaction equipment<br \/>\n<strong>Function:<\/strong> Compaction of material in the work area described in the appendix<br \/>\n<strong>Brand\/model:<\/strong> Not required; alternatives may be proposed<br \/>\n<strong>Required specifications:<\/strong> In accordance with the attached technical requirements sheet<br \/>\n<strong>Preference specifications:<\/strong> Simple operation and adapted to the project's access conditions<br \/>\n<strong>Total:<\/strong> 2 units<br \/>\n<strong>Condition:<\/strong> Please keep the purchase and rental options separate<br \/>\n<strong>Rental duration:<\/strong> Estimated at four weeks; the final date will be confirmed<br \/>\n<strong>Accessories:<\/strong> Please explain which items are included and which are not included.<br \/>\n<strong>Shipping location:<\/strong> Sample City<br \/>\n<strong>Intended use:<\/strong> The second week of the month specified in the RFQ document<br \/>\n<strong>Additional services:<\/strong> Please list mobilization, demobilization, operators, fuel, and loading\/unloading separately<br \/>\n<strong>Supporting documents:<\/strong> Photos of the work area and the specification sheet are attached<br \/>\n<strong>Commercial:<\/strong> Please explain the tax base, shipping costs, the offer\u2019s validity period, the condition of the unit, the shipping origin, the confirmed lead time, and the approved warranty.<br \/>\n<strong>PIC:<\/strong> Fictitious Name \u2014 Procurement<\/p>\n<p class=\"isSelectedEnd\">Please let us know if there is not enough data to perform a technical review.<\/p>\n<\/blockquote>\n<p class=\"isSelectedEnd\">This example does not require suppliers to claim availability. Information that is not yet confirmed is also marked as such.<\/p>\n<h2>Additional Terms for Rental RFQs<\/h2>\n<p class=\"isSelectedEnd\">For rental purposes, don\u2019t ask for the \u201ctotal rental price\u201d without specifying its components. Break it down as follows:<\/p>\n<ul data-spread=\"false\">\n<li>rental rates;<\/li>\n<li>minimum lease term;<\/li>\n<li>mobilization;<\/li>\n<li>demobilization;<\/li>\n<li>operator;<\/li>\n<li>BBM;<\/li>\n<li>deposit;<\/li>\n<li>overtime;<\/li>\n<li>damage costs;<\/li>\n<li>accessories;<\/li>\n<li>location of use;<\/li>\n<li>working hours;<\/li>\n<li>field conditions;<\/li>\n<li>loading and unloading;<\/li>\n<li>start and end dates.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">This breakdown helps prevent misunderstandings regarding which costs are included in the quotation and which are not.<\/p>\n<h2>Points to Clarify in a Quotation<\/h2>\n<p class=\"isSelectedEnd\">After the RFQ has been reviewed, the quotation should specify:<\/p>\n<ul data-spread=\"false\">\n<li>unit price or package price;<\/li>\n<li>condition of the item;<\/li>\n<li>Does VAT apply or not?;<\/li>\n<li>Is shipping included or not?;<\/li>\n<li>Included accessories:;<\/li>\n<li>accessories not included;<\/li>\n<li>the offer period;<\/li>\n<li>shipment origin;<\/li>\n<li>confirmed lead time;<\/li>\n<li>an approved warranty;<\/li>\n<li>payment terms;<\/li>\n<li>scope <a href=\"\/layanan\/\">services<\/a> additional.<\/li>\n<\/ul>\n<p class=\"isSelectedEnd\">This information must be based on verified commercial decisions. An RFQ should not be considered proof that specific inventory, rentals, warranties, or schedules are available.<\/p>\n<h2>Common Mistakes When Requesting a Quote<\/h2>\n<p class=\"isSelectedEnd\">Some common mistakes that often prolong the clarification process are:<\/p>\n<ol start=\"1\" data-spread=\"false\">\n<li>mentioning only the generic name of the tool;<\/li>\n<li>immediately selecting a model without explaining its functions and specifications;<\/li>\n<li>mixing mandatory requirements with preferences;<\/li>\n<li>does not specify the number of units;<\/li>\n<li>does not specify whether it is a purchase or a rental;<\/li>\n<li>does not include the location of use;<\/li>\n<li>using a photo without a nameplate;<\/li>\n<li>does not refer to attachments or accessories;<\/li>\n<li>assume that shipping costs and taxes are automatically included;<\/li>\n<li>does not separate rental rates from operating costs;<\/li>\n<li>does not specify a timeframe;<\/li>\n<li>did not appoint a PIC who understands the technical requirements.<\/li>\n<\/ol>\n<h2>RFQ Checklist\u2014Ready to Copy<\/h2>\n<p class=\"isSelectedEnd\">Copy the following format before submitting a request for a quote:<\/p>\n<pre dir=\"ltr\"><code dir=\"ltr\">CONSTRUCTION EQUIPMENT RFQ CHECKLIST\n\nCompany Information:\nProject\/Job Name:\nLocation of Use:\nShipping Location:\nEquipment Category:\nEquipment Function:\nApplication:\r\nRequired\/Preferred Brand:\nModel, if known:\nRequired Technical Specifications:\nPreferred Specifications:\nNumber of Units:\nCondition: new\/used\/rental\/to be determined\r\nRental Duration:\nStart Date of Use:\nProcurement Target:\nAccessories\/Attachments:\nHoses\/Cables\/Equipment:\nPower Source:\nSite Conditions:\nOperator Requirements:\r\nMobilization:\nDemobilization:\nFuel:\nLoading\/unloading:\nSupporting documents:\nTax provisions:\nAdministrative\/tender requirements:\nCost limit, if available:\nName and contact information of the person in charge (PIC):\nAdditional notes:<\/code><\/pre>\n<h2>FAQ<\/h2>\n<h3>Does the RFQ have to include the brand?<\/h3>\n<p class=\"isSelectedEnd\">Not always. A brand must be specified if required by the tender documents, internal standards, compatibility requirements, or procurement decisions. If the brand is merely a preference, mark it as such so that alternatives can still be considered.<\/p>\n<h3>What if the device model is unknown?<\/h3>\n<p class=\"isSelectedEnd\">Describe the functions, applications, field conditions, and mandatory specifications. The team reviewing the RFQ can search for candidates based on these parameters. The results must still be compared with the product source before being deemed acceptable.<\/p>\n<h3>Does the budget have to be included?<\/h3>\n<p class=\"isSelectedEnd\">It is not required. However, a budget range can help narrow down the options if the company allows that information to be shared. The budget should not replace mandatory technical specifications.<\/p>\n<h3>What information is required to rent?<\/h3>\n<p class=\"isSelectedEnd\">List the type of equipment, function, quantity, duration, date of use, location, working hours, site conditions, operator requirements, fuel, mobilization, demobilization, deposit, overtime, accessories, and loading and unloading.<\/p>\n<h3>Why are nameplate photos important?<\/h3>\n<p class=\"isSelectedEnd\">Nameplates may contain identifying information such as the manufacturer, model, serial number, or specific technical data. This information helps reduce misidentification, particularly for spare parts, unit replacements, and compatibility checks.<\/p>\n<h3>Does the RFQ price include shipping and taxes?<\/h3>\n<p class=\"isSelectedEnd\">Not necessarily. The RFQ should ask suppliers to specify whether taxes and shipping costs are included or not. The origin of shipment, destination, packaging, insurance, and loading\/unloading should also be itemized separately, if applicable.<\/p>\n<h2>Conclusion<\/h2>\n<p class=\"isSelectedEnd\">A construction equipment RFQ checklist helps procurement and project teams communicate their needs more clearly. Categories, functions, brands, models, required specifications, preferences, quantities, conditions, applications, country of origin, cost limits, logistics, and additional services should be listed separately so they can be reviewed one by one.<\/p>\n<p class=\"isSelectedEnd\">The more complete the information provided, the easier it is for the sales team to prepare a relevant quote and highlight any details that still need to be confirmed.<\/p>\n<p><strong>Gather the information about your project requirements, then <a href=\"\/layanan\/konsultasi-kebutuhan-alat-konstruksi\/\">Submit a consultation request or a request for a quote<\/a> To the Agung Rejeki team for further review.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Construction Equipment RFQ Checklist: Information You Need to Prepare for a More Accurate Quote \u2013 When requesting a quote for construction equipment, it\u2019s not enough to simply write, \u201cPlease provide a price for the machine...\u201d.<\/p>","protected":false},"author":1,"featured_media":9301,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[329,36],"tags":[],"class_list":["post-9300","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-panduan-pengadaan-alat","category-update"],"_links":{"self":[{"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/posts\/9300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/comments?post=9300"}],"version-history":[{"count":1,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/posts\/9300\/revisions"}],"predecessor-version":[{"id":9302,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/posts\/9300\/revisions\/9302"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/media\/9301"}],"wp:attachment":[{"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/media?parent=9300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/categories?post=9300"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.agungrejeki.site\/en\/wp-json\/wp\/v2\/tags?post=9300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}